The Lightning Project… part three.

Posted: September 19, 2016 in Just Me
Tags: , , , ,

Tank off, and deeper in to the mire we drift…

Original Lucas harness. This is a good sign to me, and I shall go through the connectors, and make sure the solder is good, and all the connections are cleaned and corrosion free before use, I may even put a new fuse board in the mix somewhere too.

lightning001_004-copy

Lucas harness.

With the rocker cover off you get to see the pushrods and rocker gear, everything looks pretty tidy in here..

lightning001_005-copy

Rocker assembly and pushrods

Remember where all the shims and springs go..

lightning001_008-copy

Springs and things

You need to remove the exhaust rocker shaft to access the front head bolts, before removing the head. and the front top stud, so the head can clear the frame top tube. This is also a good time to remove the Amal carbs.

lightning001_006-copy

Amal carbs ready to be removed

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s